The order is for two 15t waste handling and two 10t ash handling cranes. They will operate automatically and use the Konecranes DynA range of invertors. They will also have Konecranes DynAPilot anti-sway control fitted.
Also included in the package is a 30t turbine hall crane and several CXT wire rope hoists and smaller cranes.
The contract, worth around Euros 2.5m, will be delivered in August 2007.