Units will be fitted with radio control, DynAHoist, DynAC travel and traverse inverter controls, along with ControlPro Condition monitor “for ease of maintenance,” Konecranes said.
Other features include festoon cross crane cables, platforms on girder and trolley, upper and lower limit switches, plus cross and long travel limit switches.
The combined contract, worth in the region of £270,000, will be delivered in December.