Offshore lifting: Strong winds, heavier lifts
The blades of General Electric’s Halide-X turbine are 107 metres long
-
The HLC 29500 installed on the Orion is the largest crane Liebherr has ever made -
The Horns windfarm, 30 km off the Danish coast -
The blades of General Electric’s Halide-X turbine are 107 metres long -
SAL’s Orca-class vessels are fitted with 800t Liebherr cranes -
TORPEDOES AWAY! -
Huisman’s700mt travelling crane is specifically designed for wind turbines -
Esvagt’s new service vessel will have heavy-duty Vestdavit davits onboard -
MacGregor cranes will be fitted to Van Oord’s new generation vessels