The contractor shall remove the existing overhead trolley system and design, fabricate, install and test a new one.

The entire existing monorail system, except the track support structure, is to be removed from the building and the shipyard at the time of installation.

The monorail system must have four electrically powered under running type wire rope hoists. Each hoist should have a capacity of 2,000lb.

Solicitation number: N00406-07-T-0826.

Contact: Mary Beauchamp, contract specialist, tel: +1 360 476 5008, fax: +1 360 476 6479, email: mary.beauchamp@navy.mil.