The 8t crane will dig, mix and load general household waste into a furnace hopper that will burn the waste to create steam that in turn will turn a turbine to create energy, which is sold into the national grid, while the 5.5t crane will handle the after burn residue.
Both cranes will use DynA Invertor control on all motions and will be fully automated, but can be manually or semi automatic controlled.
The contract will be delivered by the end of 2007 and the cranes will be commissioned during March 2008.