CP&A completes design review on 3,500t crane

17 February 2023

Print Page

Casper, Phillips & Associates (CP&A) has completed a structural design review on a 3,500-ton capacity double boom offshore crane for China’s Dalian Huarui Heavy Industry Group Co. (DHHI) after being asked to find a solution for increasing the strength of certain design elements.


Each crane boom, which sits side by side at the front of the vessel, can lift 1,750 tons. They measure over 128m and will be used both singularly and in pairs. The height of the crane mast reaches 40.5m.

These dimensions allow DHHI’s crane to handle cargo as large as 32m high, with a 50m by 50m footprint, over water or on land. Similar cranes, which will typically have a captain and a crane operator, have been used to erect dockside or quayside cranes and bridges, and in offshore applications, such as wind farms or oil rigs.

CP&A analysed the crane and reported the reaction forces at the crane boom pin connections so that a foundation could be properly designed. Similarly, it reported the reactions of the mast ends attached to the barge deck under various load cases, extracting information for ship designers, so they could design for the required strength. There were a lot of different load combinations and scenarios that needed to be considered, such as different boom angles, wind, wave motions, etc. The lattice boom required many connection checks.

“The analysis was rather complex; we had to use a special pipe-to-pipe connection post-processor that we created in-house. Pre-processing is the creation of the mathematical model of the crane structure [defining structural beams, developing loads and load cases]. FEA [finite element analysis] processing is when you take the math model and solve it to get the forces in each structural member [beams and columns]. Post-processing is when you take the forces in each structural member end and check to see if the structural members and connections have adequate strength and resilience,” said Richard Phillips, mechanical engineer, CP&A.

CP&A’s stress programme takes the forces from the finite element analysis and automatically checks stresses of each member based on the specified design code. CP&A’s connection programme takes the forces from the stress calculation results and checks stresses of every pipe end connections according to the structural welding code AWS D1.1 for every single load combination.

Project execution required collaboration between Chinese and Pacific Time zones, with Mike Zhang, chief mechanical engineer at CP&A, able to communicate in mandarin. Phillips said Zhang was the lead engineer on the project.

CP&A has a long-running relationship with DHHI, notably collaborating with it on the crane base anti-seismic isolation system (Basis), which is a seismic isolation system built on nonlinear time history analysis (NLTHA). Basis can protect a crane’s main structure from damage, even in contingency-level earthquakes.