Work will include the replacement of the main hoist system including all electrical and mechanical equipment.
The auxiliary hoist system including all electrical and mechanical equipment shall also be replaced. A new operators cab shall be installed, as will a new electrical equipment enclosure.
A load indicator system shall be installed. The crane shall be tested and certified at the existing rated capacity with the new control system and a remote control system.
Detailed specification will be inclusive in the solicitation package.
Deadline: July 8 2008.
Solicitation number: W9127N08R0021.
Contact: Mark Heiller, tel: +1 503 808 4629.