The new crane shall also have a capacity of 10 US tons. The work shall include the demolition of the existing crane, hoist, and electrifications. The work also includes structural engineering analysis, replacement of the bridge, new trolley and hoist, associated motors, controls and brakes.

Solicitation number: FA9101-08-B-0010.

Contact: Karen J Buckner, email: karen.buckner@arnold.af.mil, tel: +1 931 454 4405.