The company requires the removal of the existing crane and structure, the design, manufacture, supply and works testing of the new unit. Thereafter, the installation and commissioning of the new crane and structure is also necessary.

The AEA is managing several nuclear decommissioning projects. Building B12 is a nuclear facility with receipt and export facilities for flasks utilising overhead cranes for offloading and loading.

Deadline: June 26 2006.

Contact: Eric Lewis, Didcot OX11 0RA. Tel: +44 (0)1946 772 493, email: eric.lewis@ukaea.org.uk, fax: +44 (0)1946 772 756.