Belgium-based Olsen Engineering has completed the installation of a customised lifting system at Essity’s facility in Stembert.

The project, carried out by Olsen Engineering’s Liège team, involved installing a monorail system designed to handle loads of up to 4,000kg, as well as an overhead crane with a load capacity of 2,500kg.

The new equipment is intended to help Essity staff handle engines, turbines, and related accessories safely and efficiently during maintenance operations.

According to Olsen Engineering, the solution aims to streamline maintenance procedures and combine functionality with cost-effectiveness.

Olsen Engineering emphasises proximity to customers and a strong focus on after-sales service as key aspects of its business approach, supporting customer satisfaction.

Essity is a multinational hygiene and health company reaching an estimated one billion people in 150 countries through its products.

The company traces its history to 1929 as part of SCA, expanding into hygiene and health with a series of acquisitions beginning in the 1970s, including Swedish company Mölnlycke and Wisconsin Tissue.

Olsen Engineering, operating in Wallonia and the Grand Duchy of Luxembourg, has provided lifting equipment for more than 30 years.

The business employs over 50 staff across its three operating sites in Charleroi, Liège, and Luxembourg.

In addition to representing the ABUS brand for standard lifting applications, Olsen also designs solutions to meet specific requirements.

The newly installed system at Essity’s Stembert site combines a high-capacity monorail with an overhead crane to support maintenance tasks and equipment handling at the facility.